FMEs, FMPs, FMSs, and FMXs are terms related to flood planning and mitigation, commonly used in regional flood planning efforts. Here’s a breakdown of each term:

  • FMEs (Flood Management Evaluations)

    These are studies or assessments aimed at better understanding flood risks for a given region, identifying areas with the highest flood risk (i.e., “problem areas” or “hot spots”), and developing potential flood risk reduction solutions. Some examples include regional flood risk assessments, master drainage plans, project feasibility studies, and preliminary engineering (up to 30% design).
  • FMPs (Flood Management Projects)

    FMPs are the detailed design and construction of infrastructure improvement projects designed to reduce flood risks. Some examples include the construction of levees, reservoirs, detention ponds, or improvements to drainage conveyance systems.
  • FMSs (Flood Management Strategies)

    These are policies, regulations, or non-structural measures aimed at reducing flood risks. Some examples include zoning regulations, floodplain management ordinances, flood warning systems, and public awareness programs.
  • FMXs (Flood Mitigation Measures)

    This is a broader, more flexible term used to encompass various actions that fall under flood management evaluations (FMEs), projects (FMPs), or strategies (FMSs). It refers to any specific steps taken to identify or mitigate flood risks, whether structural or non-structural.

The FMX list provided below shows the flood mitigation measures that have currently been identified for the Lower Brazos Region. These items are an amalgamation of input received directly from entities and publicly available data discussing ongoing flood planning within the region. Collected FMXs are vetted against TWDB and RFPG guidelines to ensure they align with the intent of the regional flood planning process. Items that meet the guidelines are recommended within the Regional Flood Plan and are subsequently included within the State Flood Plan, while items that do not meet the guidelines are included in a non-recommended list that is not incorporated into the State Flood Plan.

FMXs must be included within the Regional and State Flood Plans to be eligible for state funding through the Texas Water Development Board. This means they must be brought forth or supported by an entity, meet all TWDB and RFPG guidelines, be recommended within the Regional Flood Plan, and be wrapped up into the State Flood Plan by the TWDB. The FMX list collected for the Lower Brazos Region is updated within each 5-year planning cycle to include additional flood mitigation measures for funding eligibility.


Tips: Click any column header to sort the data. Scroll horizontally to view all columns. Hover over rows for highlighting. Click here to view table in Excel.
FME0810000351240-acre Fulshear Farms DevelopmentDesign of detention and hydraulic structure upgrades to offset development impacts.Fort BendCity of FulshearFeasibility Assessment$147,000NoStudy area is less than one square mile.
FME081000041Fulshear Lakes Drainage ImprovementsDesign of drainage infrastructure to mitigate flooding in Fulshear Lake development.Fort BendCity of FulshearFeasibility Assessment$151,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000042Lea/Penn and Red Bird Lane ImprovementsDesign of diversion channel and road construction to reduce flooding and provide access to neighborhoods.Fort BendCity of FulshearPreliminary Engineering$262,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000044Sienna South Levee System DrainageDesign of lake and channel modifications to mitigate development in the area.Fort BendSienna LIDFeasibility Assessment$320,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000045Sienna North Levee System DrainageDesign of channel improvements to mitigate flow caused by increased development.Fort BendSienna LIDFeasibility Assessment$236,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000047Sugar Creek Drainage ImprovementsDesign of storm drain updates throughout neighborhood.Fort BendCity of Sugar LandPreliminary Engineering$388,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000048Covington Woods Jess Pirtle Bridge Channel ImprovementsDetermination of necessary repairs to ditch A-22 channel flow lineFort BendCity of Sugar LandPreliminary Engineering$111,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000057Chimneystone, Austin, and Settlers Parks Improvements Phase IIDesign of new concrete channel and storm drain improvements.Fort BendCity of Sugar LandPreliminary Engineering$288,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000058Sugar Lakes Drainage ImprovementsDetermination of necessary storm drain improvements and lake control structure modifications.Fort BendCity of Sugar LandPreliminary Engineering$348,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000060Sugar Creek Regional DetentionUpdate design to account for Atlas 14 rainfall.Fort BendCity of Sugar LandH&H Modeling$300,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000061Sugar Land Business Park Regional DetentionUpdate design to account for Atlas 14 rainfall.Fort BendCity of Sugar LandH&H Modeling$300,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000075Sugar Land MDP - Master Drainage Plan UpdatesReview comprehensive plan goals, update detention facility ownership and assets, consider funding mechanisms, evaluate ranking criteria.Fort BendCity of Sugar LandDrainage Master Plan$534,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000089Riverbend Drainage Improvements Phase IIUpdate design to account for Atlas 14 rainfall.Fort BendCity of Sugar LandH&H Modeling$100,000NoStudy area is less than one square mile.
FME081000091Sugar Land Citywide Flood Prevention & Drainage StudiesStudy to determine how to replace B-B inlets with C-2 or H2 inlets in areas of ponding and structural risk.Fort BendCity of Sugar LandPreliminary Engineering$219,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000092Avalon/Brazos Landing/ Commonwealth Drainage Imp 1 & 2Study to determine improvements needed for FBC LID 14 weir.Fort BendCity of Sugar LandPreliminary Engineering$335,000NoNo official sponsor approval
FME081000107ATLAS 14 Outfall Structure No. 6Design of improvements to Outfall Structure No. 6.Fort BendSienna LIDFeasibility Assessment$320,000NoNo official sponsor approval
FME081000108ATLAS 14 Brazos River Outfall ChannelDesign of improvements to the Brazos River Outfall Channel.Fort BendSienna LIDFeasibility Assessment$330,000NoNo official sponsor approval
FME081000110Conversion of N & S Pump Stations to Vertical TurbinesDesign of improvements to the N & S Pump Stations.Fort BendSienna LIDFeasibility Assessment$330,000NoNo official sponsor approval
FME081000111Regional Storage Phase 2Design of improvement to regional storage.Fort BendSienna LIDFeasibility Assessment$320,000NoNo official sponsor approval
FME081000112Pump Station Conversion at the Woods Acreage Estates OutfallDesign of pump station to provide relief to Woods Acreage Estates in flood events.Fort BendSienna LIDFeasibility Assessment$149,000NoNo official sponsor approval
FME081000114400,500 PM Pump Station at Outfall No. 2Study to design additional pump station at Outfall No. 2Fort BendSienna LIDPreliminary Engineering$571,000NoNo official sponsor approval
FME081000115Fort Bend County Flood Protection Levee for all Pump Station ElectricsStudy to design levees to protect pump stations that mitigate flooding in Somervell.Fort BendSienna LIDFeasibility Assessment$365,000NoNo official sponsor approval
FME081000135Lake Leon Dam & Emergency Spillway ImprovementsStudy to determine necessary dam improvements to reduce flood risk downstream.Comanche, Callahan, EastlandEastland CountyPreliminary Engineering$183,000NoNo official sponsor approval
FME081000136Hunting Shirt Creek Culvert ImprovementsDesign of drainage feature improvements to increase capacity and ensure they are within standards.EastlandCity of CarbonFeasibility Assessment$360,000NoNo official sponsor approval
FME081000138Cisco Storm Sewer Upgrades and ExtensionsUpgrade storm sewer system and install new water lines to improve existing drainage.EastlandCity of CiscoDrainage Master Plan$244,000NoNo official sponsor approval
FME081000164Arcola Regional Drainage ImprovementsStudy to design and place drainage improvements such as detention ponds, pump stations, and road grading improvements.Fort BendCity of ArcolaDrainage Master Plan$193,000NoNo official sponsor approval
FME081000168Cresson Storm Drainage ImprovementsStudy to determine how to increase the capacity of the storm drainage system by installing larger culverts and adding drainage points along vulnerable or critical roads.Hood, Johnson, ParkerCity of CressonDrainage Master Plan$326,000NoNo official sponsor approval
FME081000175City of Lipan Roadside Ditch ImprovementsDesign infrastructure to improve roadside ditch drainage and build curbs to increase water flow during flood events.HoodCity of LipanFeasibility Assessment$152,000NoNo official sponsor approval
FME081000177City of Tolar Roadside Ditch ImprovmentsStudy to determine necessary expansions and improvements to roadside drainage ditches to increase water flow during flood events.HoodCity of TolarFeasibility Assessment$154,000NoNo official sponsor approval
FME081000184Mineral Wells State Park Dam ImprovementsDesign of dam improvements to reduce flood risk downstream.Palo Pinto, Parker, JackTexas Parks and WildlifePreliminary Engineering$73,000NoNo official sponsor approval
FME081000186Culvert Additions to Prevent Flash Flooding in City of MingusNew infrastructure to improve drainage conditions.Palo PintoCity of MingusDrainage Master Plan$170,000NoNo official sponsor approval
FME081000188City of Strawn Mitigations for Flood Prone AreasDevelop study to determine/ address flood risk.Stephens, Palo Pinto, EastlandCity of StrawnDrainage Master Plan$588,000NoNo official sponsor approval
FME081000189Tucker Lake Dam and Spillway MaintenanceDesign of dam improvements to reduce flood risk downstream.Palo PintoCity of StrawnPreliminary Engineering$50,000NoNo official sponsor approval
FME081000193Palo Pinto Retaining WallsDesign of retaining walls along county roads where landslides due to flooding is probable.Palo PintoPalo Pinto CountyFeasibility Assessment$1,856,000NoNo official sponsor approval
FME081000199Resley Creek Drainage ImprovementsDesign of improvements to channel to increase conveyance capacity.Comanche, ErathCity of DublinPreliminary Engineering$52,000NoNo official sponsor approval
FME081000207Austin County - Improve DrainageIdentify and evaluate drainage projects including storm sewer, channel, and crossing improvements.AustinAustin CountyDrainage Master Plan$1,088,000NoNo official sponsor approval
FME081000212San Felipe Street ElevationStudy to determine necessary elevation of street to decrease inundation in food events.AustinCity of San FelipePreliminary Engineering$50,000NoNo official sponsor approval
FME081000213Pond Improvements to Cryan ParkDesign of improvements to detention pond.AustinCity of SealyPreliminary Engineering$50,000NoNo official sponsor approval
FME081000214Pond Improvements to BPW ParkDesign of improvements to detention pond.AustinCity of SealyPreliminary Engineering$50,000NoNo official sponsor approval
FME081000223Texas A&M Detention PondStudy to determine placement and sizing of detention facility to contain and mitigate flooding.BrazosCity of College StationFeasibility Assessment$207,000NoNo official sponsor approval
FME081000226Bee Creek Basin Detention PondDesign of detention facility to contain and mitigate flooding.BrazosCity of College StationPreliminary Engineering$111,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000228City of Bryan Flood StudyPerform Study to determine and address flood risk throughout the city.BrazosCity of BryanDrainage Master Plan$584,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000233Dam Failure Analysis for Bryan Utilities LakeAn Emergency Action Plan (EAP) was created for the Bryan Utilities Lake Dam. The EAP contains information on who will be notified in the case of a dam failure.BrazosBrazos CountyStudy on Flood Preparedness$136,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000235Burleson County Dam Failure StudyStudy to determine condition and salvageability of dams on local lakes.BurlesonBurleson CountyStudy on Flood Preparedness$1,000,000NoNo official sponsor approval
FME081000237Lake Somerville Dam Failure StudyDevelop study to determine/ address flood risk.Brazoria, Fort Bend, Austin, Waller, Washington, Burleson, Grimes, BrazosBurleson CountyStudy on Flood Preparedness$250,000NoNo official sponsor approval
FME081000245Basin-Wide Stormwater Drainage Plan UpdateReview and update the basin-wide stormwater drainage plan county-wideBellBell CountyRegional Watershed Studies$4,740,000NoNo official sponsor approval
FME081000250City of Bartlett Regional Drainage ImprovementsUpgrade undersized drainage channels and culverts in flood prone areas.Williamson, BellCity of BartlettDrainage Master Plan$156,000NoNo official sponsor approval
FME081000252City of Holland Drainage Infrastructure ImprovementsUpgrade/ improve undersized drainage system to increase capacity and reduce flooding.BellCity of HollandDrainage Master Plan$176,000NoNo official sponsor approval
FME081000253City of Killeen Drainage Infrastructure ImprovementsUpgrade undersized drainage system throughout the city to increase storm water capacity and reduce flooding.BellCity of KilleenDrainage Master Plan$583,000NoNo official sponsor approval
FME081000256City of Little River Academy Drainage Infrastructure ImprovementsUpgrade undersized drainage system throughout the city to increase storm water capacity and reduce flooding.BellCity of Little River-AcademyDrainage Master Plan$185,000NoNo official sponsor approval
FME081000259Improve Levee Crossing and Old Nolanville RoadDesign of drainage feature improvements to increase capacity and study to ensure they are within standards.BellCity of NolanvillePreliminary Engineering$50,000NoNo official sponsor approval
FME081000266City of Rogers Drainage Infrastructure ImprovementsDrainage feature improvements to increase capacity and ensure infrastructure is within standards.Milam, BellCity of RogersDrainage Master Plan$397,000NoNo official sponsor approval
FME081000272City of Temple Drainage Channel ImprovementsUpgrade drainage channels within the city to reduce flooding to residential and commercial structures.BellCity of TempleDrainage Master Plan$659,000NoNo official sponsor approval
FME081000273City of Troy Drainage System ImprovementsUpgrade undersized drainage system throughout the city to increase storm water capacity and reduce flooding.BellCity of TroyDrainage Master Plan$230,000NoNo official sponsor approval
FME081000277Cow House Creek Retention StructureAddition of retention facility to contain flood waters and mitigate flooding.Coryell, Mills, Hamilton, ComancheCity of HamiltonPreliminary Engineering$73,000NoNo official sponsor approval
FME081000278Hamilton City Lake Dam Failure StudyDevelop study to determine/ address flood risk.HamiltonCity of HamiltonStudy on Flood Preparedness$174,000NoNo official sponsor approval
FME081000281Hamilton County Electric Gates for Pecan Creek DamImprove dam to reduce flood risk downstream.HamiltonHamilton CountyPreliminary Engineering$50,000NoNo official sponsor approval
FME081000289City of Hico Drainage System ImprovementsUpgrade undersized culverts to increase capacity and implement debris removal for ditches.HamiltonCity of HicoDrainage Master Plan$165,000NoNo official sponsor approval
FME081000290Milam County Emergency Hazard PlanObtain Belton and Stillhouse Dam inundation maps and participate in hazard drills.MilamMilam CountyStudy on Flood Preparedness$20,000NoNo official sponsor approval
FME081000291Milam County Roads ImprovementsImprovement of drainage across county roads.MilamMilam CountyDrainage Master Plan$1,883,000NoNo official sponsor approval
FME081000295City of Buckholts Drainage Master PlanDevelop study to determine/ address flood risk.MilamCity of BuckholtsDrainage Master Plan$164,000NoNo official sponsor approval
FME081000296City of Cameron H&H Study to Determine ProjectsDevelop study to determine/ address flood risk.MilamCity of CameronDrainage Master Plan$250,000NoNo official sponsor approval
FME081000297Little River Ox Bow and Dam Improvement and RelocationImprove dam to reduce flood risk downstream.MilamCity of CameronPreliminary Engineering$219,000NoNo official sponsor approval
FME081000298City of Milano H&H Study to Determine Improvement ProjectsDevelop study to determine/ address flood risk.MilamCity of CameronDrainage Master Plan$179,000NoNo official sponsor approval
FME081000300City of Rockdale H&H Study to Determine Improvement ProjectsDevelop study to determine/ address flood risk.MilamCity of CameronDrainage Master Plan$229,000NoNo official sponsor approval
FME081000322Teague Master Drainage PlanDevelop study to determine/ address flood risk.FreestoneCity of TeagueDrainage Master Plan$250,000NoNo official sponsor approval
FME081000323Teague Riverine Erosion Control Master PlanDevelop study to determine/ address flood risk.FreestoneCity of TeagueDrainage Master Plan$406,000NoNo official sponsor approval
FME081000324City of Teague Drainage Infrastructure ImprovementsDrainage feature improvements to increase capacity and ensure they are within standards.FreestoneCity of TeagueDrainage Master Plan$216,000NoNo official sponsor approval
FME081000327Grimes County Drainage Infrastructure ImprovementsIdentify flood-prone areas and determine mitigation including enlarging culverts under roads and bridges.Washington, GrimesGrimes CountyDrainage Master Plan$1,706,000NoNo official sponsor approval
FME081000331Improve Cedar CreekImprovements to channel to increase conveyance capacity.Grimes, BrazosCity of NavasotaPreliminary Engineering$111,000NoNo official sponsor approval
FME081000333Drainage Study of Cedar CreekConduct a drainage study of Cedar Creek to identify flood areas and provide accurate data to assist the community with existing and future management of mitigation issues.BellBell CountyRegional Watershed Studies$174,000NoNo official sponsor approval
FME081000334Drainage Study of Sandy Creek TributaryConduct drainage study of Sandy Creek Tributary and complete a flood control project to reduce flood levels on new structures.GrimesCity of NavasotaRegional Watershed Studies$305,000NoNo official sponsor approval
FME081000359Johnson County Inundation Study of Hazardous DamsIdentify, through inundation studies, what property, utility or infrastructure would be impacted by dam failure within countyJohnsonJohnson CountyStudy on Flood Preparedness$75,000NoNo official sponsor approval
FME081000365City of Cleburne Inundation Study of Hazardous DamsIdentify, through inundation studies, what property, utility or infrastructure would be impacted by dam failure within countyJohnsonJohnson CountyStudy on Flood Preparedness$214,000NoNo official sponsor approval
FME081000366City of Godley Inundation Study of Hazardous DamsIdentify, through inundation studies, what property, utility or infrastructure would be impacted by dam failure within countyJohnsonJohnson CountyStudy on Flood Preparedness$50,000NoNo official sponsor approval
FME081000368City of Joshua Inundation Study of Hazardous DamsIdentify, through inundation studies, what property, utility or infrastructure would be impacted by dam failure within countyJohnsonCity of JoshuaStudy on Flood Preparedness$79,000NoNo official sponsor approval
FME081000371Drainage Improvements along CR1139Drainage feature improvements to increase capacity and ensure they are within standards.LampasasLampasas CountyPreliminary Engineering$50,000NoNo official sponsor approval
FME081000372Drainage Improvements along CR4450Drainage feature improvements to increase capacity and ensure they are within standards.LampasasLampasas CountyPreliminary Engineering$50,000NoNo official sponsor approval
FME081000373Lampasas County Curbing and Drainage ImprovementsStudy to determine how to install an effective curbing and drainage systemLampasasLampasas CountyDrainage Master Plan$1,627,000NoNo official sponsor approval
FME081000378Improve Flood Risk Assessment for Lee County Incorporating the procedures for tracking high-water marks following a flood into emergency response plans. Using GIS to map areas that are at risk from flooding. Developing and maintaining a database to track community exposure to flood risk.LeeLee CountyStudy on Flood Preparedness$50,000NoNo official sponsor approval
FME081000379Lee County Floodplain Management PlanDevelop a new floodplain management plan. Adopting a post-disaster recovery ordinance.LeeLee CountyStudy on Flood Preparedness$50,000NoNo official sponsor approval
FME081000384Lee County Project Prioritization StudyDevelop study to determine/ address flood risk.LeeLee CountyFeasibility Assessment$1,550,000NoNo official sponsor approval
FME081000388City of Lexington Floodplain Management PlanDevelop a new floodplain management plan. Adopting a post-disaster recovery ordinance.LeeLee CountyStudy on Flood Preparedness$50,000NoNo official sponsor approval
FME081000396City of Marquez Drainage Infrastructure ImprovementsStudy to determine whether new infrastructure is needed or how to improve existing drainage infrastructure.LeonCity of MarquezDrainage Master Plan$162,000NoNo official sponsor approval
FME081000398City of Normangee Drainage Infrastructure ImprovementsStudy to determine whether new infrastructure is needed or how to improve existing drainage infrastructure.Madison, LeonCity of NormangeeDrainage Master Plan$155,000NoNo official sponsor approval
FME081000405City of Groesbeck Expand Drainage DitchesDetermine where to deepen and widen ditches to allow for rapid runoff of stormwater.LimestoneCity of GroesbeckDrainage Master Plan$236,000NoNo official sponsor approval
FME081000508City of Bryson Stream Restoration ProgramImplement stream restoration / channelization program to ensure adequate drainage / diversion of stormwater.JackCity of BrysonFeasibility Assessment$159,000NoNo official sponsor approval
FME081000518City of Graham Upgrade Drainage FeaturesUpgrade undersized stormwater drains and culverts.YoungCity of GrahamDrainage Master Plan$256,000NoNo official sponsor approval
FME081000523Create 2nd Main Water LineNew water line to increase capacity of system.YoungCity of GrahamPreliminary Engineering$73,000NoNo official sponsor approval
FME081000534Comprehensive Flood Risk StudyDevelop study to determine/ address flood risk.Young, ArcherCity of OlneyStudy on Flood Preparedness$171,000NoNo official sponsor approval
FME081000542City of Olney Upgrade Drainage FeaturesComprehensive study of flood risk and reduction alternatives.YoungCity of OlneyDrainage Master Plan$184,000NoNo official sponsor approval
FME081000551Robertson County Master Drainage PlanDevelop study to determine/ address flood risk.RobertsonRobertson CountyDrainage Master Plan$1,759,000NoNo official sponsor approval
FME081000553Dam/Levee Failure StudyDevelop study to determine/ address flood risk.RobertsonRobertson CountyStudy on Flood Preparedness$3,799,000NoNo official sponsor approval
FME081000555Bremond Master Drainage PlanDevelop study to determine/ address flood risk.RobertsonCity of BremondDrainage Master Plan$145,000NoNo official sponsor approval
FME081000559Calvert Master Drainage PlanDevelop study to determine/ address flood risk.RobertsonCity of CalvertDrainage Master Plan$227,000NoNo official sponsor approval
FME081000563Franklin Master Drainage PlanDevelop study to determine/ address flood risk.RobertsonCity of FranklinDrainage Master Plan$157,000NoNo official sponsor approval
FME081000572Somervell County Drainage System ImprovementsStudy to identify capital improvements for the storm drainage system.SomervellSomervell CountyDrainage Master Plan$958,000NoNo official sponsor approval
FME081000574Somervell County Dam Failure StudyDevelop study to determine/ address flood risk.Johnson, Bosque, Hill, SomervellSomervell CountyStudy on Flood Preparedness$1,100,000NoNo official sponsor approval
FME081000579Glen Rose Master Drainage PlanDevelop study to determine/ address flood risk.SomervellCity of Glen RoseDrainage Master Plan$227,000NoNo official sponsor approval
FME081000581Three Mile Creek Watershed StudyWatershed based planning and analysis to determine flood risk.WallerWaller CountyRegional Watershed Studies$2,312,000NoNo official sponsor approval
FME081000601Cleanup of Indian CreekMaintenance efforts to preserve hydraulic capacity and decrease risk to Railroad St.WashingtonCity of BrenhamPreliminary Engineering$50,000NoNo official sponsor approval
FME081000605Williamson County Comprehensive Flood Protection PlanDevelop study to determine/ address flood risk.WilliamsonWilliamson CountyStudy on Flood Preparedness$100,000NoNo official sponsor approval
FME081000610New Town West Outlet StructureNew infrastructure to improve drainage conditions.Travis, WilliamsonCity of HuttoPreliminary Engineering$50,000NoNo official sponsor approval
FME081000611Town of San Felipe Harvey State Mitigation ProjectImprovement and upgrade of many drainage features throughout San Felipe.AustinCity of San FelipePreliminary Engineering$155,000NoNo official sponsor approval
FME081000613City of Freeport Sanitary System Flood ProofingImplementation of point repairs, lateral seals, and manhole rehabilitation to protect system from storm events.BrazoriaCity of FreeportPreliminary Engineering$251,000NoNo official sponsor approval
FME081000615Clute Regional Flood Risk ReductionDitch improvements at several key locations to reduce flood risk.BrazoriaCity of CluteStudy on Flood Preparedness$62,000NoNo official sponsor approval
FME081000616City of Oyster Creek Sanitary System Flood ProofingImplementation of point repairs, lateral seals, and manhole rehabilitation to protect system from storm events.BrazoriaCity of Oyster CreekPreliminary Engineering$229,000NoNo official sponsor approval
FME081000618Glenwood Bayou Drainage ImprovementsImprovement and upgrade of many drainage features throughout Glenwood Bayou.BrazoriaCity of RichwoodPreliminary Engineering$157,000NoNo official sponsor approval
FME081000619Angleton Drainage ProjectImprovement and upgrade of many drainage features throughout Glenwood Bayou.BrazoriaCity of AngletonPreliminary Engineering$1,127,000NoNo official sponsor approval
FME081000625Texas Historical Commission & Brazoria County Joint Mitigation Application 1 FINALPhased project to assess, design, and build both service and emergency spillways and implement drainage improvements to the Columbia Lakes Reservoir.BrazoriaBrazoria CountyPreliminary Engineering$329,000NoNo official sponsor approval
FME081000626Town of Holiday Lakes Hurricane Harvey HUD ApplicationImprovements to road drainage at several locations, and addition of sluice gates into the drainage system.BrazoriaCity of Holiday LakesPreliminary Engineering$163,000NoNo official sponsor approval
FME081000627West Columbia Drainage ImprovementsImprovements to 7 major drainage channels.BrazoriaCity of West ColumbiaPreliminary Engineering$231,000NoNo official sponsor approval
FME081000628Oyster Creek Wastewater Treatment Plant ImprovementsFloodproofing of wastewater treatment plant.BrazoriaCity of AngletonPreliminary Engineering$480,000NoNo official sponsor approval
FME081000629City of Eastland Dam RepairsMaintenance and spillway improvements to Ringling Lake dam and Lake Eastland Dam.EastlandCity of EastlandPreliminary Engineering$388,000NoNo official sponsor approval
FME081000630Lake Leon Dam Safety ImprovementsStabilization of the upstream embankment and rehabilitation of the spillway.EastlandCity of EastlandPreliminary Engineering$382,000NoNo official sponsor approval
FME081000632Richmond Northside Drainage ImprovementsEngineering study to determine how to elevate several key structures above base flood elevations.Fort BendCity of RichmondPreliminary Engineering$303,000NoNo official sponsor approval
FME081000633Brazos River StabilizationRiverbank stabilization along SH 99 and US 59/I-69 using environmentally friendly solutions.Fort BendFort Bend CountyPreliminary Engineering$2,958,000NoNo official sponsor approval
FME081000634City of Navasota Harvey State Mitigation ProjectDrainage and street improvements along 3 major routes integral to the City.Grimes, BrazosGrimes CountyPreliminary Engineering$173,000NoNo official sponsor approval
FME081000635City of Lexington Drainage ImprovementsStorm sewer, culvert, and drainage ditch improvements at 3 areas of interest.LeeCity of LexingtonPreliminary Engineering$267,000NoNo official sponsor approval
FME081000636City of Rockdale Supplemental Drainage ProjectAddition of storm sewer drainage to supplement roadside ditch.MilamCity of RockdaleFeasibility Assessment$229,000NoNo official sponsor approval
FME081000637Town of Buckholts Harvey MitigationIncrease capacity of hydraulic features and redirect water away from water treatment plant.MilamCity of BuckholtsPreliminary Engineering$200,000NoNo official sponsor approval
FME081000639Ham Branch Watershed Flood MitigationImplementation of several drainage features and streambank stabilization.MilamCity of RockdaleRegional Watershed Studies$113,000NoNo official sponsor approval
FME081000640City of Milano Citywide Road and Drainage ImprovementsStreet improvements and addition of accompanying drainage features.MilamCity of MilanoPreliminary Engineering$50,000NoNo official sponsor approval
FME081000641Hempstead Citywide Drainage ProjectImprovements to roadside ditch and addition of 2 detention facilities.WallerCity of HempsteadPreliminary Engineering$368,000NoNo official sponsor approval
FME081000642Burton Drainage & Flooding ImprovementsFloodproofing of lift stations and water treatment plants, and street drainage improvements.WashingtonCity of BurtonPreliminary Engineering$177,000NoNo official sponsor approval
FME081000643Hogg Branch Creek ImprovementsChannel improvements to increase drainage throughout Brenham.WashingtonCity of BrenhamPreliminary Engineering$219,000NoNo official sponsor approval
FME081000644City of Taylor Regional Detention and Channel ImprovementsAddition of 2 drainage facilities in the region and corresponding channel improvements.WilliamsonCity of TaylorDrainage Master Plan$406,000NoNo official sponsor approval
FME081000646Briar Creek ImprovementsChannel and crossing improvements along Briar Creek and Red River Trib to increase capacity of hydraulic infrastructure.BrazosCity of BryanPreliminary Engineering$364,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000657Briarcreek Court FloodingStudy to determine source and mitigation for flooding in the subdivision.BrazosCity of BryanPreliminary Engineering$83,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000663Burton Creek CrossingsUpdate design to account for Atlas 14 rainfall.BrazosCity of BryanH&H Modeling$100,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000669Burton Creek Trib C Improvements2-9'x5' box culverts are needed to replace the existing culverts in order to convey the 50-year storm event per the TxDOT design requirement. Channel widening and re-grading may be necessary to mitigate any adverse impacts. Detailed design for the 100-y*BrazosCity of BryanH&H Modeling$100,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000671Tract North of Carson CrossingChannel and crossing improvements along Trib D feeding into County Club Lake.BrazosCity of BryanPreliminary Engineering$214,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000678Burton Creek Main Stem ImprovementsChannel and crossing improvements along Burton Creek mainstem from SH 6 to S Coulter Dr.BrazosCity of BryanPreliminary Engineering$514,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000686Oakridge Drive and Barak LakeStudy to determine storm sewer needed to mitigate flooding in subdivision.BrazosCity of BryanPreliminary Engineering$129,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000689Sprucewood Street FloodingA study of the Sprucewood Street drainage and a detailed design phase is needed to assess existing flooding and propose improvements that will reduce flooding in the area. This project includes the local analysis to determine the cause of flooding and *BrazosCity of BryanPreliminary Engineering$50,000NoStudy area is less than one square mile.
FME081000690Burton Creek Trib 5 MitigationDesign of erosion control and channel improvements for Trib 5 of Burton Creek.BrazosCity of BryanPreliminary Engineering$194,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000693Spring Lane Residential FloodingDrainage study to assess flooding in the neighborhood and propose improvementsBrazosCity of BryanPreliminary Engineering$50,000NoStudy area is less than one square mile.
FME081000697Burton Creek Trib 7 MitigationDetailed study to determine flooding caused by Burton Creek Trib 7 and determine flood mitigation solutions.BrazosCity of BryanPreliminary Engineering$86,000NoStudy area is less than one square mile.
FME081000706Briar Oaks Drive Storm Sewer ImprovementsUpdate design to account for Atlas 14 rainfall.BrazosCity of BryanH&H Modeling$50,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000716Pecan Ridge Subdivision FloodingMasterplan to determine source of flooding and identify potential solutions.BrazosCity of BryanPreliminary Engineering$50,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000717Old Reliance Road OvertoppingStudy to determine design of culvert improvements.BrazosCity of BryanPreliminary Engineering$51,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000718Castle Heights Subdivision FloodingStudy to determine necessary detention, storm sewer, and other drainage improvements for Castle Heights subdivision.BrazosCity of BryanPreliminary Engineering$221,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000719Carter's Creek Trib B ImprovementsStudy to design culvert improvements along Carter's Creek Trib B.BrazosCity of BryanPreliminary Engineering$127,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000723Ranchettes 2 and 3 - EastUpdate road and add drainage swale.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$53,000NoNo official sponsor approval
FME081000724Ranchettes 2 and 3 - WestUpdate road and add drainage swale.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$81,000NoNo official sponsor approval
FME081000725Ranchettes 4 - NorthLocal infrastructure improvements including additon of drainage swales to the roads.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$96,000NoNo official sponsor approval
FME081000726Ranchettes 4 - South AUpdate road and add drainage swale.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$83,000NoNo official sponsor approval
FME081000727Ranchettes 4 - South BUpdate road and add drainage swale.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$71,000NoNo official sponsor approval
FME081000728Ranchettes 6 and 6A - North BAddition of roadside and interconnecting drainage swales.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$130,000NoNo official sponsor approval
FME081000729Ranchettes 6 and 6A - North AAddition of drainage swales that outfall into Block House Creek.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$56,000NoNo official sponsor approval
FME081000730Block House CreekProperty acquisition and crossing improvements to create room for consistent channelization.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$192,000NoNo official sponsor approval
FME081000733Ranchettes 6 and 6A - South ALocal infrastructure improvements adjacent to the creek.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$126,000NoNo official sponsor approval
FME081000734Ranchettes 6 and 6A - South BAddition of roadside and interconnecting drainage swales. Addition of roadside and interconnecting drainage swales. Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$127,000NoNo official sponsor approval
FME081000735Riviera - NorthwestAddition of roadside drainage swale and several outfalls into the floodplain.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$76,000NoNo official sponsor approval
FME081000736Riviera - EastAddition of roadside drainage swale and several outfalls into the floodplain.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$125,000NoNo official sponsor approval
FME081000737Riviera - SouthwestAddition of roadside drainage swale and several outfalls into the floodplain.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$74,000NoNo official sponsor approval
FME081000738Cluck Creek - UpperRe-grading of natural channel.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$78,000NoNo official sponsor approval
FME081000739Cluck Creek - LowerRe-grading of natural channel.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$155,000NoNo official sponsor approval
FME081000740Deer RunAddition of underground storm drainage and associated inlets.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$80,000NoNo official sponsor approval
FME081000741Spanish Oak CreekIncrease channel capacity.Travis, WilliamsonCity of Cedar ParkPreliminary Engineering$80,000NoNo official sponsor approval
FME081000745Suja LaneImplementation of detention basin to alleviate street and property flooding.Lampasas, CoryellCity of Copperas CovePreliminary Engineering$50,000NoNo official sponsor approval
FME081000752Goode - Connell Park Regional Detention Pond Improvement & Proposed Drainage ChannelExpand the regional detention pond to reduce outflow and improve outlet channel.BellCity of Harker HeightsPreliminary Engineering$66,000NoNo official sponsor approval
FME081000756Christina Circle Drainage ImprovementsRe-grading of cul-de-sac to improve drainage and replacement of existing flume.BellCity of Harker HeightsPreliminary Engineering$50,000NoNo official sponsor approval
FME081000757Indian Trail Downstream Channel ImprovementsChannel improvements.BellCity of Harker HeightsPreliminary Engineering$50,000NoNo official sponsor approval
FME081000762Warriors Path Drainage ImprovementsDrainage channel and structure improvements.BellCity of Harker HeightsFeasibility Assessment$266,000NoNo official sponsor approval
FME081000764City of Round Rock Erosion ControlErosion control at several key tributaries.Travis, WilliamsonCity of Round RockDrainage Master Plan$510,000NoNo official sponsor approval
FME081000767Chisolm ValleyAdditional modeling to determine detention basin improvements and placement.Travis, WilliamsonCity of Round RockPreliminary Engineering$138,000NoNo official sponsor approval
FME081000779Stewart Ditch Channel Repair and ImprovementsStudy to design channel improvements along Stewart DitchBellCity of KilleenPreliminary Engineering$67,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000780Dickens Ditch Stream RepairStabilization efforts downstream of Westcliff Road.BellCity of KilleenPreliminary Engineering$50,000NoNo official sponsor approval
FME081000782Bunny Trail Drainage ImprovementsPreliminary engineering to determine drainage improvements.BellCity of KilleenPreliminary Engineering$52,000NoNo official sponsor approval
FME081000785Andrus Channel ImprovementsChannel improvements and re-configurations at several key locationsFort BendFort Bend CountyH&H Modeling$300,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000865Flat Bank Creek Widening and Clean-Out ProjectImprovements to Flat Bank Creek.Fort BendSienna Plantation LIDPreliminary Engineering$133,000NoNo official sponsor approval
FME081000874Nolan Creek Flood Protection Planning StudyStudy to provide flood protection planning in the Nolan Creek Watershed and to develop an early warning system, local flood response plan, and possible flood protection plan.BellBell CountyRegional Watershed Studies$349,000NoNo official sponsor approval
FME081000875Waco Creek Diversion TunnelAddition of a diversion culvert t reroute flow from Waco Creek to the Brazos River. Additional improvements to existing diversionMcLennanCity of WacoPreliminary Engineering$1,909,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000877New Road to Homan Avenue Channel ImprovementsChannel improvements to increase the conveyance capacity of the roadside ditch.McLennanCity of WacoH&H Modeling$300,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000878S. MLK Jr Boulevard Channel ImprovementsChannel improvements to increase the conveyance capacity of the roadside ditch.McLennanCity of WacoPreliminary Engineering$117,000NoNo official sponsor approval
FME081000881Sharondale, Carver, and Browns Lake Drainage ImprovementsDrainage infrastructure improvements to reduce flooding in the Sharondale, Carver, and Browns Lake areas.McLennanCity of WacoPreliminary Engineering$715,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000884N. 10th, 15th, 31st, 33rd Street, and Grice Drive BuyoutsProperty acquisition of several residencies at high flood risk.McLennanCity of WacoPreliminary Engineering$366,000NoNo official sponsor approval
FME081000890Loop 340 Berm & Frontage Road ImprovementsStudy to expand on the recently completed existing conditions model assessment. Conduct a needs assessment and identify mitigation solutions (FMPs) to be incorporated into the flood plan.McLennanCity of WacoH&H Modeling$300,000YesProvided by sponsor and is in line with TWDB requirements.
FME081000917Develop Capital Improvements PlanDevelop plan to provide prediction of funds available for long term improvements and equipment that would be beneficial.WilliamsonCity of FlorenceStudy on Flood Preparedness$50,000NoStudy area is less than one square mile.
FME081000921City of Georgetown Increase River/Channel Flow CapacityIncrease flow by deepening and widening the channel.WilliamsonCity of GeorgetownFeasibility Assessment$606,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000922City of Georgetown River Erosion ControlReduce flood and erosion risk with riverbank stabilization and riverbank walls.WilliamsonCity of GeorgetownFeasibility Assessment$606,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000924City of Georgetown Culvert ImprovementsIncrease size of culverts at key locations to adequately convey storm water.WilliamsonCity of GeorgetownFeasibility Assessment$606,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000926Channel StabilizationStabilize channel at inner loop culverts.WilliamsonCity of GeorgetownFeasibility Assessment$556,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000934Low Water Crossing Monitoring & MitigationInstall automated warning devices or elevate 2 low water crossings on CR 305.WilliamsonCity of JarrellFeasibility Assessment$217,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000936Lift Station FloodproofingFlood proof city lift stations or improve culverts to lessen flood risk.WilliamsonCity of JarrellFeasibility Assessment$217,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000939Dam Emergency Action PlanComplete EAPs for Sites 9, 29, 2, 3, 6, 7, 17, 18, and 25 to be in compliance with TCEQ standards.WilliamsonWilliamson CountyStudy on Flood Preparedness$500,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000941Mustang Creek StudyDetailed H&H modeling to mitigate flooding from Upper Mustang Creek on the City of Taylor.WilliamsonCity of TaylorRegional Watershed Studies$290,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000942Stream Crossing UpgradesUpgrade crossings at CR 368, 369, 445, and 424.WilliamsonCity of TaylorFeasibility Assessment$463,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000943Lake Creek Structural ElevationElevate or floodproof structures currently in high risk areas. Use H&H modeling to prioritize properties.Travis, WilliamsonCity of Round RockFeasibility Assessment$510,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000944Lake Creek Tributary 2Develop H&H models for watershed and evaluate methods to provide flood protection to the area.Travis, WilliamsonCity of Round RockRegional Watershed Studies$166,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000945Improve Chandler Branch TributaryChannel improvements from Eagles Nest St to Settlement Dr.WilliamsonCity of Round RockFeasibility Assessment$202,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000946Brushy Creek StabilizationUse toe blocks and re-establish riparian vegetation zone to stabilize 1200 feet of stream banks.WilliamsonCity of Round RockFeasibility Assessment$121,000NoStudy area is less than one square mile.
FME081000950Barker Street Neighborhood ImprovementsDetermine optimal drainage improvements to maximize flood protection for the area.Travis, WilliamsonCity of ThrallDrainage Master Plan$440,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000951Brushy Creek Tributaries StudyPerform a detailed study of the Brushy Creek tributaries in the City of Thrall.WilliamsonCity of ThrallRegional Watershed Studies$88,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000953A21Addition of in-line detention along Cottonwood Creek.WilliamsonUpper Brushy Creek WCIDPreliminary Engineering$250,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000954A12New Broade Street off-channel detention.Travis, WilliamsonUpper Brushy Creek WCIDPreliminary Engineering$257,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000955Dam 101Construction of dam to provide flood storage for Lake Creek.Travis, WilliamsonUpper Brushy Creek WCIDPreliminary Engineering$1,262,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000956Dam 102Study to design dam to provide flood storage for Lake Creek.Travis, WilliamsonUpper Brushy Creek WCIDPreliminary Engineering$1,000,000YesProvided by sponsor and is in line with the TWDB requirements.
FME081000957620 Quarry SolutionStudy to determine needed flood storage to address Lake Creek flooding.Travis, WilliamsonCity of Round RockPreliminary Engineering$877,000YesProvided by sponsor and is in line with the TWDB requirements.